Scheduling a report

Scheduling a report

by James Todd -
Number of replies: 2

I've scheduled an ad hoc report to run every day at 12.

It never runs

I'm sure I've followed the instruction, any ideas what I could be missing.


Thanks.

Average of ratings: -